planning estimate
英 [ˈplænɪŋ ˈestɪmət]
美 [ˈplænɪŋ ˈestɪmət]
网络 计划概算
双语例句
- Any decision-making of planning derives from evaluation of the project, so to make the last decision on rail transit planning of metropolis is to estimate and compare the pre-election planning scenarios and to select the first-rank one.
任何规划的决策最终都会归结为对规划方案的评价,因此都市圈轨道交通系统规划的决策也最终归结为对都市圈轨道线网规划方案的优劣进行评价。 - In the early stage of software life-cycle, due to planning project resources reasonably by developer, need to estimate the software size. In the project-review phase, need a quicker and more effective estimate method for obtaining software size to determine the budgets.
软件生命周期早期阶段需要对软件的规模进行估算,以便于开发方合理安排项目资源,软件立项评审时为确定项目经费,需要更快速高效的早期估算方法来获取软件规模。 - COCOMO II is an objective cost model for planning and executing software projects that supports return-on-investment decisions with a credible basis of estimate.
COCOMOII是一个客观的软件项目计划和执行的费用模型,它支持在可靠的估计基础上的投资回报决定。 - Common methods of urban water needs prediction are experience prediction, statistic analysis, planning estimate, and grey prediction.
城市用水量需求预测常见的方法有经验预测法、统计分析法、规划估算法、灰色预测法。 - Capability Requirement Planning Module is responsible for the planning of manufacturing resources according to estimate of market demands, supplies the company with data for resource planning.
资源需求计划模块根据企业对产品族各个产品的市场需求预测信息以及产品族各个部件对生产能力的需求数据,进行企业资源需求计划,为企业提供制造资源能力的中长期规划分析; - Objective: To find out the effect of Population and Family Planning Network ( PFPN) on AIDS prevention and estimate the status of ADIS's knowledge among public to provide strategy of AIDS prevention in Sichuan rural area.
目的:了解四川省农村地区人口计生网络参与艾滋病预防的工作现状,提出在农村地区参与艾滋病预防的策略。 - Planning poker is an excellent way to estimate the size of user stories.
规划策略是评估用户场景大小最好的方法。 - When planning to transfer and store snapshot files, estimate the disk space required at the snapshot file location and at the subscriber that will receive the snapshot files.
制定传输和存储快照文件的计划时,请估计将接收快照文件的快照文件位置和订阅服务器所需的磁盘空间。 - With proper planning coupled with realistic simulation, this tool uses the current loads to estimate future loads.
通过适当的计划,这一工具利用当前的负载来估计未来的负载。 - At last, preliminarily study the moderation of the flexibility; give opinion respectively in making the planning; estimate flexibility level after the improvement; and prove the feasibility of the improvement measures.
最后,对柔性的适度性进行了初步研究,提出了园区的改进措施,并估算改进后的柔性水平,证明了改进措施的可行性。
